Released 2026-09-17
Version 3.12.87
Notes 1–28 of 28
Asset select: Tiles now show the asset type under the name.
Forms: Required and invalid fields now share the same red outline.
Home: Your apps now show tile placeholders while they load.
Load Job: You can add Process as a results column.
Operate: You can add Process to Loaded Jobs cards. Saving those fields applies on the station immediately.
Operate: Materials used is now its own card. You can move it, but it stays on the layout.
Operate: Required cycles now show as a progress bar under the job timer.
Operate: The running timer now shows the attached cycle instead of the job number.
Operate: You can pick a different cycle on the next shot when the counter starts a new timer.
Processes: Cycle settings now edit in a sheet instead of stacked cards.
Processes: Define cycles on a process, pick one when recording production, and see required cycle progress on the job. The process list now shows how many cycles are assigned. Timer goal and OEE target use a single hh:mm:ss field. Estimated consumables require a variant.
Processes: Drag a cycle to change its order.
Processes: Add a cycle consumable by picking the item, then the variant, then the quantity.
Production: Loaded job progress now shows the batch quantity you recorded, not a split across jobs.
Workstations: A selected station no longer shows Selected on the tile.
Entity settings: Sites can turn off Stop eligible on the logout confirm so running timers keep going.
Jobs: Completing a job now waits until every required cycle has been recorded.
Processes: Cycle name and qty cells restore the saved value if the typed value is not valid.
Operate: Cycle progress and materials stay in place when you already arranged the workstation widgets.
Operate: Cycle picker tiles now show an icon.
Operate: Cycle picker tiles now show the cycle qty instead of Required cycle.
Operate: Cycle progress bars now show each cycle name inside the bar.
Operate: Cycle progress is now its own card under the job timer.
Operate: Cycle progress shows placeholders while meters load, and an empty state when there is nothing to show.
Operate: Cycle progress under the job timer now shows the job number.
Operate: You can choose whether cycle progress bars show each cycle name.
Processes: Empty cycle lists now explain how to add the first one.
Processes: You can sort the process list by how many cycles or files each one has.